In 2001 Siemens de México decided to close its panelborad, swtitchboard and electrical equipment integration plant in the city of Guadalajara, Mexico.
A strategic alliance is made in which Siemens personnel and technology are transferred to our facilities, giving rise to Electrical Support.
Our first installations in 2001 with only 10 people working in an area of 5,000 square feet and capacity of 10 cabinets per month.
First participation in the construction expo in 2001 in Guadalajara, Mexico.
In 2004 Siemens decided to reopen its panelboard, swtichboard and electrical equipment plant integration in Guadalajara, which led to having to seek alternative growth and more options for the market.
The brands that were integrated in that stage were: ABB, General Electric, Eaton, Siemens and Arteche
During 2005 Electrical Support realized the need to develop some of its own products that would complement some of the existing integration and distribution lines and at the same time respond to market needs.
In accordance with the above, we began with the development of our own line of Electrical Support Brand products, in which we integrate electrical equipment from other firms.
In 2006 we integrated computer design into our engineering area.
In 2007 we changed our facilities to a new production plant with a space of 10,800 square feet and a capacity of 20 cabinets per month.
In 2008 we launched our first switchboard with a capacity of 1,200 to 3,200 amperes.
In 2008 we obtained our first NOM-ANCE certification for switchboards.
In 2009 we launched our first panelboard with a capacity of 400 to 1,200 amps.
In 2010 we launched our first concentration of self-supporting meters on the market.
In 2010 we launched our line of Motor Control Centers on the market.
In 2011 we launched our line of our own service switchboards for AC and DC.
In 2012 we increase our capacity by 30 cabinets per month in the same production plant.
In 2013 we changed our facilities to a new production plan with a space of 27,000 square feet and a capacity of 50 cabinets per month.
In 2013 we received our first big PO from PDVSA for the amount of 2 million dollars.
In 2013 we received a project from ABB-IIPSA, 120 cabinets for Ronal plant in San Luis Potosí, SLP.
In 2014 we increase our capacity by 60 cabinets per month in the same production plant.
In 2014 we received a project from ABB, 280 cabinets for Ternium Pesquería plant in Monterrey, Nuevo Leon.
In 2016 we received a project from ABB, 240 cabinets for Nissan plant in Aguascalientes, Aguascalientes.
In 2017 we obtained CFE Lapem certification for DC and AC switchboards.
In 2017 we received a project from Iberdrola, 180 cabinets for Electric Generation Plant Escobedo at El Carmen in Monterrey, Nuevo León.
In 2018 we obtained multiple contracts for the manufacture of more than 800 cabinets in one year.
Right now because of the crisis in Mexico and the Pandemic:
1.- We changed to a new location, is the half of the other plant but we can produce the same quantity of equipment.
2.- We are right now only 50% of the people, but we change the way to work looking only for great companies and standard products.